工程量计算表.docx
《工程量计算表.docx》由会员分享,可在线阅读,更多相关《工程量计算表.docx(34页珍藏版)》请在第一文库网上搜索。
1、表8工程量计算表序号项目编号项目名称单位数量部位计算式O1010101001001平整场地ma4081.75同建筑面积G1-286平整场地m24612.954081.75+2*(56+72.2)*2+8*0,15+16=4612.9502010101003001挖沟槽土方m325.49JK110.25*(8-1.655)*0.6*5+0.25*(8-1.66)*0.6*13+0.25*(8-2.21)*0.6*4+0.25*(8-2.03)*0.6*2=22.39JK120.2*(8-2.03)*0.6*3+0.25*(8-1.66)*0.6*1=3.10以上合计:22.39+3.1=25.4
2、9G1-143人工挖沟槽m349.10JK111/2(0.646+0.25)*0.6*(8-1.655)*5+1/2(0.646+0.25)*0.6*(8-1.66)*13+1/2(0.646+0.25)*0.6*(8-2.21)*4+1/2(0.646+0.25)*0.6*(8-2.03)*1=40.12JK121/2(0.596+0.2)*0.6*(8-2.025)*3+1/2(0.646+0.25)*0.6*(8-1.66)*1=8.98以上合计:40.12+8.98=49.1003010101004001挖基坑土方m3883.96ZT5-2(2.95*1.2)*2.2*28=218.0
3、6ZT5-31/2*3.83*3.32-3*(1/2*0.23*0.2)*2.0*49=616.30ZT5-4(2.95*2.95)*1.9*3=49.60以上合计:218.06+616.30+49.60=883.96G1-152人工挖基坑m3432.99ZT5-2(3.55*1.8)*(0.15+0.5)*28=116.30ZT5-31/2*4.22*4.87-3*(1/20.92*0.80)*(0.15+0.5)*49=292.12ZT5-4(3.55*3.55)*(0.15+0.5)*3=24.57以上合计:116.30+292.12+24.57=432.99G1-159挖掘机挖基坑土方
4、(不装车)m3931.24ZT5-2(3.55*1.8)*1.55*28=277.33ZT5-312*4.22*4.87-3*(1/2*0.92*0.80)*1.35*49=606.71ZT5-4(3.55*3.55)*1.25*3=47.26以上合计:277.33+606.71+47.26=931.24G1-297基地钎探m2542.6ZT5-23.05*1.3*28=111.02ZT5-31/2*4.52*3.92-3*(1/2*0.69*0.6)*49=403.67ZT5-43.05*3.05*3=37.91以上合计:111.02+403.67+27.91=542.60401010300
5、1001土方回填m34701.75室内回填(1.2-0.13)*(56-0.25)*(72.2-0.25)=4292.00基础回填909.42-(26.58+453.85+19.24)=409.75以上合计:4292.00+409.75=4701.75G1-241自卸汽车运土方(载重8t以内)m33663.06外取土49.10+432.99+931.24-5076.39=-3663.06G1-280回填土m35076.39室内回填(1.2-0.13)*(4081.75-0.25*256.4-0.2*91.8)=4211.83基础回填(432.99+931.24)-(26.58+453.85+1
6、9.24)=864.47以上合计:4211.83+864.47=5076.39G1-282填土夯实m35076.39同回填土工程量05010301002001预制钢筋混凝土管桩m494523*(28*2+49*3+3*4)=4945.00G3-28静力压预应力混凝土管桩m5363.5ZT5-2(23+0.65+1.5-0.05)*28*2=1405.60ZT5-3(23+0.65+1.3-0.05)*49*3=3660.30ZT5-4(23+0.65+1.2-0.05)*3*4=297.60以上合计:1405.60+3660.30+297.60=5363.5006010301004001截(凿