1、本英文版为内部资料,仅供参考,以中文版为准。The Chinese version of standards has precedence to their English translations which are only for internal reference.中华人民共和国行业标准Industry Profession Standardof the Peoples Republic of ChinaDL 408 91电业安全工作规程(发电厂和变电所电气部分)Working Regulation of Power Safety(The Electric Part of Power
2、 Plant and Substation)Issued on March 18, 1991 Implemented as of September 1, 1991Issued by Ministry of Energy Sources of the Peoples Republic of ChinaContents1 General Provisions42 Basic Demands for the Work with the Equipments of High Voltage52.1Shift Responsibilities at the Power Plant and Substa
3、tion52.2 Patrol for the Equipments of High Voltage62.3Operation of Reversing the Brake72.4Safety Measure Classification for the Work on the Equipments of High Voltage93 Organization Measures for Guaranteeing the Safety103.1System of Work Ticket103.2The System of Work Permission143.3The System of Wor
4、k Guarding143.4The System of Work Interruption, Transferring and Termination154 Technical Measures of Safety Assurance174.1Cutting Power174.2Checking Power184.3Connecting the Grounding Wires194.4Hanging Warning plates and Installing Blocks215The Safety Measures of the Power Plant and Substation Duri
5、ng the Circuit Work226Hot-line Work236.1General Provisions236.2General Technical Measures246.3Equipotential Work256.4Alive Line Connection and Disconnection of Leads276.5Alive Line Short-circuiting of Equipment286.6 Alive Line Water Flushing296.7Alive Line Explosive Pressure Connection316.8Induction
6、 Voltage Protection326.9Overhead Insulated Bucket-arm Trolley336.10Alive Line Cleaning by Air Blowing336.11Protection Gap346.12Alive Line Test of Insulators346.13Alive Line Work under Low Voltage356.14Keeping & Testing of Alive Line Work Tools357 Maintenance of Generators, Synchronous Condensers & H
7、V Motors388 Work on SF6 Electrical Equipment399 Work on LV Distribution Equipment & LV Conductors with Power Cut Off4210 Work on relay protection, instrument & other secondary circuits4211 Electrical Test4411.1 High Voltage Test4411.2 Measurement Using Portable Instruments4611.3 Measurement Using Cl
8、amp-on Ammeter4711.4 Measurement of Insulation with a Megameter4712Electric Power Cable Working4913Other Safety Measures50Appendix 1Format of Operation ticket for reversing the brake51Appendix 2Format of First Kind of Work Ticket52Appendix 3Format of Second Kind of Work Ticket54Appendix 4Warning Pla
9、te Style55Appendix 5mon Electric Insulation Tools Test List56Appendix 6Testing Standard List of Ascent Safety Tools57Appendix 7Temporary Standard of SF6 Make Up Gas Quality57Appendix 8Emergency Rescue Method581General rules582Electroshock emergency rescue583Wound emergency rescue67Chapter1 General P
10、rovisionsArticle 1 For the purpose of guaranteeing the safety and health of the working people, and the safe performance of the electric system and the equipments of electricity generation and distribution, by integrating the practical experience of the electricity production in many years, this reg
11、ulation has been drawn out.Every leader and cadre and electric worker of every unit must abide by this regulation strictly.Article 2 Everybody is responsible for working safety. The leaders of all levels must set themselves examples to others, bringing the multiple into play and relying on the multiple pletely; and exert the role of safety supervision institutions and the safety organizations of the multiple, so that to supervise the carrying out and performance of this regulation.Article 3 This regulation is applicable to all of the people (including the p